Skip to content
Wide Furniturefurniture

Turnkey delivery, end to end

One partner from the design to opening day. Manufacture and installation as standard, design and service added on request.

  • 4

    stages of the partnership

  • 4–7 wks

    from quote to installation

  • DE / PL

    installation markets

Modules in several sizesJoinery made to measureNothing from a mass catalogueModules in several sizesJoinery made to measureNothing from a mass catalogue
01

Design

On request. We usually work from the client's design, but we can prepare our own.

Result: An approved design and a line-by-line quote

  • Review of the architect's design with suggested changes
  • Site survey, always for made-to-measure joinery
  • Concept, 3D model and visualisations
  • Technical and workshop drawings
02

Manufacture

Our own joinery, paint shop and sewing room in Poland. Steel parts and classic upholstery go to partners in the country.

Result: Furniture ready to ship, with documentation and an item list

  • CNC machining and joinery
  • Lacquering in our own paint shop
  • Steel fittings and final assembly
  • Sewn seat covers, including outdoor furniture
03

Fit-out

We carry it in, install it and hand over a venue ready to open.

Result: A venue ready on opening day

  • Transport in our own vans or with a carrier, logistics always on us
  • Installation by our own crew, in Germany and Poland
  • Coordination with the other trades on site
  • Handover with the site manager
04

Service

On request. After opening day we stay available.

Result: A standard that holds at every future opening

  • Warranty and post-warranty service
  • Selected parts held in stock
  • Single components made to order
  • The same standard repeated in the next venue
Why turnkey

Four stages,
one person to call

When we take the whole thing, the three most common causes of site delays disappear.

One deadline

One date, and one person whose job is to hold it.

One responsibility

When something doesn't fit, there is no argument about whose fault it was. All three are us.

One quote

Line by line, with no catch-all 'other'.

Chains and rollouts

The second venue goes up
faster than the first

Each further venue in the same chain needs less analysis and fewer execution changes, so it takes less time. The only limit is the queue on the machines and in the paint shop.

Venue 1

Design review, line-by-line quote, manufacture and installation

Venue 2

Modules already specified, quote within two working days

Venue 3+

Fewer execution changes, shorter preparation

After opening

Warranty and post-warranty service, components to order